Medias De Compresion Para Hombres Mujeres Graduada Talla Grande S-XXL 3 Pares

Medias De Compresion Para Hombres Mujeres Graduada Talla Grande S-XXL 3 Pares

USD 17.24 USD
SKU: XXF3gXdL
Brand: Unbranded
GTIN: Does not apply
Condition: New

Specifications

ColorBlack
Sock SizeS/M (Small / Medium)
Sock Quantity3 Pares
SizeS/M - XXL
MaterialCotton and Spandex
GenderUnisex, Women, Men
ImpressionSoft, Compression
BrandUnbranded
TypeCompression Socks
ModelThe All Sport
Body AreaKnee, Leg, Ankle
Gradient Compression15-20 mmHg
Intended UseLeg Brace

15-20mmHg graduated compression improves circulation and relieves tired legs. Available in 3 or 6 pairs, S/M to XXL, Black or Beige. Perfect for daily wear, travel, nursing, and pregnancy. ---------- Wide calf friendly – S/M, L/XL, XXL sizes fit calf 9"-24".

Related Items